Collecting quotes for a pavilion, and one of them is clearly cheaper than the rest? That is a good moment to stop. At first glance, pavilions look much the same: steel frame, walls, roof, windows, doors. The differences lie in what the quote doesn’t show: the scope of delivery, the quality of the installations and the terms of the warranty.
Three areas most often make quotes differ, and here we show them through examples of the kind investors meet in practice. Comparing pavilion quotes only makes sense when you compare the same scope.
Why the quoted price isn’t the cost of the pavilion
The price on a quote is the figure the supplier has put in a document. The cost of a pavilion is everything the buyer pays before the unit starts earning its keep: the pavilion itself, transport, unloading, positioning, connecting the installations, sign-off and, later, any repairs. If one quote includes these items and another doesn’t, setting the two figures side by side leads to the wrong decision.
The examples below are illustrative. They show typical situations in which a quote that looks cheaper on paper turns out dearer in practice.
Example 1: transport and unloading “to be agreed”
A beauty salon owner orders a 6×3 m service pavilion to stand on a leased section of a car park next to a housing estate. She compares two quotes. The first covers the pavilion with delivery, crane unloading and positioning on prepared concrete blocks. The second is clearly cheaper, but next to “transport” it says “priced individually”, and unloading isn’t mentioned at all.
She picks the cheaper one. A week before delivery, it turns out that transport is charged per kilometre and that she has to book the crane herself, for a specific day – the day when the estate car park is at its busiest. The crane waits for the lorry to arrive, the lorry can’t get through a narrow gate, and positioning slips by several days. Each of these is an extra cost that wasn’t part of the comparison.
The lesson: before comparing prices from pavilion suppliers, check whether the quote covers transport, unloading and positioning, and who is responsible for checking site access. A supplier who asks about conditions on site before the contract is signed saves the buyer surprises on delivery day.
Example 2: installations without documents – a problem at sign-off
An entrepreneur opens a food outlet in a pavilion by a road out of town. He chooses a quote in which the pavilion has “full electrical and plumbing installations” at a lower price than the competition. The unit arrives, looks good, and the sockets work.
The problem appears at sign-off and when the contract with the energy supplier is set up. There are no test reports for the electrical installation and no documents showing who carried it out. The installation has to be checked again, some of the cabling replaced, and the opening slips by several weeks. In food service, every week without sales is a real loss, and the cost of the corrections easily exceeds the difference in price between the quotes.
The lesson: ask who carries out the installations and whether they are qualified to do so, what documents you will receive with the pavilion and whether the unit carries CE marking. An installation isn’t only about whether it works on delivery day, but also about whether it can be signed off and insured without problems.
Example 3: a warranty given “by word of mouth”
A logistics company buys a service pavilion as a gatehouse at the entrance to a distribution centre. The salesperson at the cheaper supplier assures them that “everything is under warranty”, but the contract contains only one sentence about the warranty, with no period and no scope.
After the first winter, the flashing around a window leaks and the air conditioner stops heating. The supplier says the window is “a matter of on-site installation” and that the air conditioner has a separate manufacturer’s warranty, which the company has to claim on its own. Because the contract says nothing specific, the company has no clear terms to point to when it asks for a repair. The gatehouse is staffed around the clock, so the repair has to be ordered straight away, at the company’s own expense.
The lesson: a warranty should be in writing, with a defined period and scope – separately for the structure, the installations and the fittings. It is also worth knowing who to report a fault to and how quickly the supplier responds.
Questions to ask every pavilion supplier
Whether the pavilion is to be an office, a service salon, a food outlet or a gatehouse, ask every supplier the same questions before you compare quotes:
- structure – what the frame is made of and how the steel is protected against corrosion,
- insulation – what the walls, roof and floor are insulated with and whether the unit is suitable for year-round use,
- installations – who carries them out, what documents you will receive and whether the unit carries CE marking,
- fittings – exactly what is included in the price: air conditioning, lighting, blinds, WC, kitchenette,
- transport and positioning – whether the quote covers delivery, crane unloading and positioning, and who checks site access,
- documentation and warranty – what documents you will receive with the unit and what the written warranty terms are.
It is worth collecting the answers in a single table. Only then can you see which quotes are comparable and which merely look cheaper.
Compare the scope, not just the price
The cheapest quote can turn out to be the most expensive if it doesn’t include transport, installations with documents or a written warranty. Before you decide, ask all suppliers the same questions and compare the answers. Get in touch and we’ll prepare an offer for a pavilion that shows from the start exactly what you get.